SUDARSHAN PLB HDPE DUCT PIPES
|
||||||||||
---|---|---|---|---|---|---|---|---|---|---|
AS PER TECH - 2019 (TEC/ GR/ FA/ CDS-008-04/AUG-19)
|
||||||||||
SL NO
|
NOMINAL DIA
|
WT MAX. MIN
|
INNER LAYER
|
WALL THICKNESS
|
WT/MTR
|
|||||
OD MIN
|
OD MAX
|
SIZE
|
WT
|
WT+-
|
WT – MIN
|
WT – MAX
|
WT- MIN
|
WT - MAX
|
||
1
|
32MM
|
32.3
|
32/26
|
3
|
0.2
|
0.24
|
0.36
|
2.8
|
3.2
|
0.262
|
2
|
40 MM
|
40.4
|
40/33
|
3.5
|
0.2
|
0.28
|
0.42
|
3.3
|
3.7
|
3.385
|
3
|
50 MM
|
50.5
|
50/42
|
4
|
0.3
|
0.32
|
0.48
|
3.7
|
4.3
|
0.555
|
4
|
63 MM
|
63.6
|
63/57
|
3
|
0.4
|
0.36
|
0.54
|
2.6
|
3.4
|
0.543
|
5
|
63 MM
|
63.6
|
63/57
|
3
|
0.4
|
0.36
|
0.54
|
6.1
|
6.9
|
1.108
|
6
|
75 MM
|
75.7
|
75/76
|
5
|
0.5
|
0.4
|
0.6
|
4.5
|
5.5
|
1.055
|
7
|
90 MM
|
90.9
|
90/79
|
5.5
|
0.5
|
0.44
|
0.66
|
5
|
6
|
1.402
|
8
|
110 MM
|
111
|
110/96
|
7
|
0.6
|
0.54
|
0.84
|
6.4
|
7.6
|
2.173
|
9
|
110 MM
|
111
|
110/80
|
15
|
06
|
0.54
|
0.84
|
14.4
|
15.6
|
4.298
|
1
|
Internal Pressure Creep Rupture Test of Pipe (Acceptance test) Duration-48h Temp-80°C
|
Visual
|
Cl-8.1.1, Of IS-4984:2016 & Table-5 Of- TEC/GR/FA/CDS-008/04/AUG-19
|
Table-5 Of- TEC/GR/FA/CDS-008/04/AUG-19
|
The Pipe under test shall not show signs of localized swelling, leakage o weeping and shall not burst when tested at Test Temperature a 80° C for 48 Hours, Induced Stress as per Table 5 of TEC/GR/FA/CDS-008/04/AUG-19
|
---|---|---|---|---|---|
2
|
Internal Pressure Creep Rupture Test of Pipe joint (Acceptance test) Duration-165h Temp-80°C
|
Visual
|
Cl-8.1.1, Of IS-4984:2016 & Table-5 Of- TEC/GR/FA/CDS-008/04/AUG-19
|
Table-5 Of- TEC/GR/FA/CDS-008/04/AUG- 19
|
The Pipe under test shall not show signs of localized swelling, leakage o weeping and shall not burst when tested at Test Temperature a 80° C for 48 Hours, Induced Stress as per Table 5 of TEC/GR/FA/CDS-008/04/AUG-19
|
3
|
Reversion
|
Measured by Hot Air Oven.
|
8.2, Annex F of IS:4984 - 2016
|
Cl-4.6 TEC/GR/FA/CDS-008/04/AUG-19
|
As per CI. No.8.2 , Annex F of IS:4984 – 2016 & Cl-4.6,TEC/GR/FA/CDS-008/04/AUG-19 the Longitudinal reversion shall not be greater than 3%
|
4
|
Melt Flow Rate
|
Measurement by MFI Tester
|
Cl-4.19
|
TEC/GR/FA/CDS-008/04/AUG-19 & IS-2530:1963
|
When tested from a composite sample of Min three pipes as per IS 2530 at 190° C with nominal Load of 5 Kgf MFR shall not deviate from the MFR of the resin by more than 30%
|
5
|
Oxidation induction Time
|
Measured By OIT Tester
|
Cl-4.13 & Annex-1
|
TEC/GR/FA/CDS-008/04/AUG-19
|
The minimum Oxidation Induction Time of the pipe when tested in accordance with the method given Annex 1 , shall be not less than 30 Minutes.
|
6
|
Density
|
Measurement by Density Tester
|
Cl-4.18
|
TEC/GR/FA/CDS-008/04/AUG-19
|
when tested from a composite sample of Min three pipes as IS 7328 the Base Density of pipe shall be between940 to 958 Kg/m3.
|
7
|
Tensile Strength & Elongation
|
Measurement by UTM Tester
|
Cl-4.5
|
EC/GR/FA/CDS-008/04/AUG-19
|
Test according ASTM F2160 & ASTM D638 the test specimens Punch / Machined from pipe samples, the Elongation shall be ≥ 500.% & Tensile strength at Yield- ≥20N/mm².
|
8
|
Environment stress crack Resistance
|
Measured by ESCR Tester
|
Cl-4.7
|
EC/GR/FA/CDS-008/04/AUG-19
|
Test according to ASTM D-1693, There shall be no failure/crack.
|
9
|
Impact strength
|
Conducted by Impact Testing machine
|
Cl-4.8
|
EC/GR/FA/CDS-008/04/AUG-19
|
Test according to IS-12235 Pt-9, the Duct shall not crack or split.
|
10
|
Crush Resistant
|
Conducted by Crush resistant Tester
|
Cl-4.9
|
EC/GR/FA/CDS-008/04/AUG-19
|
The deflection with load on and after recovery period(5min) shall not exceed 10% & 2% Respectively
|
11
|
Mandrel Test
|
Visual
|
Cl-4.10
|
EC/GR/FA/CDS-008/04/AUG-19
|
150mm long mandrel of dia 3mm less than the internal dia of duct shall be passed through a 5meter length of Duct freely throughout the length, when the duct is bent to a radius of 5Meter
|
12
|
Internal Co-Efficient of Friction
|
Measurement by UTM Tester
|
Cl-4.15 & Annex-2
|
EC/GR/FA/CDS-008/04/AUG-19
|
a) For Nylon Jacketed unarmored OFC : 0.06 Max. For HDPE PLB Ducts b) For HDPE Jacketed Unarmored OFC: 0.20 Max. For HDPE PLB Ducts |
13
|
Ash Content
|
Conducted by muffle furnace
|
Cl-4.2
|
EC/GR/FA/CDS-008/04/AUG-19
|
The ash content of the duct shall not be more than 0.3%
|
14
|
Test for fading of colour of duct
|
Visual
|
Cl-4.21
|
EC/GR/FA/CDS-008/04/AUG-19
|
When Tested Accordance to ASTM D-1712,There shall be no Discolouration
|
15
|
Pulling force required to pull out two pieces of Duct Joint by Coupler
|
Visual
|
Cl-5.2
|
EC/GR/FA/CDS-008/04/AUG-19
|
The test may be conducted by loading the coupler joined by two pieces of duct for 15 minutes using UTM Pulling force required: - 110/80-800kgf 63/50-550kgf 50/42-450kgf 40/33-320kgf 26-250kgf |